{"id":89487,"date":"2025-11-06T11:40:40","date_gmt":"2025-11-06T11:40:40","guid":{"rendered":"https:\/\/solarhouse.bg\/energy-efficiency-program-in-just-transition-regions\/"},"modified":"2026-04-02T07:48:17","modified_gmt":"2026-04-02T07:48:17","slug":"energy-efficiency-program-in-just-transition-regions","status":"publish","type":"post","link":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/","title":{"rendered":"Energy Efficiency Program in Just Transition Regions"},"content":{"rendered":"<h2>Support for photovoltaic systems and facilities: BGN 141 million for SMEs<\/h2>\n<p data-start=\"482\" data-end=\"748\">The procedure<strong data-start=\"494\" data-end=\"600\"> BG16FFPR003-4.011 &#8220;Support for photovoltaic systems and facilities in micro, small and medium-sized enterprises&#8221;<\/strong> is<strong data-start=\"603\" data-end=\"633\"> open for applications<\/strong> in the MIS 2020 from <strong data-start=\"649\" data-end=\"677\">19.12.2025 (11:00 a.m.)<\/strong> to<strong data-start=\"681\" data-end=\"709\"> 24.03.2026 (5:00 p.m.)<\/strong>.<\/p>\n<p data-start=\"482\" data-end=\"748\">The conditions for application and implementation of investments are <a href=\"https:\/\/eumis2020.government.bg\/bg\/s\/Procedure\/Info\/04096806-593d-454b-9425-b2f9f7dea399\" target=\"_blank\" rel=\"noopener\">published on the UMIS website.<\/a><\/p>\n<p data-start=\"750\" data-end=\"1051\">The funding is aimed at investments in <strong data-start=\"794\" data-end=\"880\">photovoltaic installations in combination with local storage facilities (batteries)<\/strong> to reduce electricity costs, improve energy independence and support the transition to a cleaner economy.<\/p>\n<h2>What does the program fund?<\/h2>\n<p>The program provides grants for SMEs that want to build photovoltaic installations and systems for storing the energy produced.<\/p>\n<p>It includes two main components.<\/p>\n<h3><strong>Component 1: for own consumption<\/strong><\/h3>\n<p data-start=\"1110\" data-end=\"1356\">Component 1 is for enterprises that will use the <strong data-start=\"1181\" data-end=\"1208\">produced energy for their own needs<\/strong>, with the installation being up to <strong data-start=\"1230\" data-end=\"1241\">1 MW<\/strong> and being<strong data-start=\"1244\" data-end=\"1296\"> implemented in combination with a battery<\/strong> (local storage).<\/p>\n<p data-start=\"1358\" data-end=\"1626\">Important restriction: the<strong data-start=\"1377\" data-end=\"1402\"> installed capacity<\/strong> of the PV system for own consumption should <strong data-start=\"1444\" data-end=\"1510\">not exceed more than 2 times the provided capacity<\/strong> (according to the certificate\/contract with the ERD), but in all cases<strong data-start=\"1566\" data-end=\"1587\"> no more than 1 MW<\/strong>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-89415 size-full alignnone\" src=\"https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-8aedd8dfb87a05791ba636422a964adf9c8475afeb7b7bb2a55b5647aae8f858_983fa92e57e16377.jpg\" alt=\"\" width=\"1440\" height=\"810\" srcset=\"https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-8aedd8dfb87a05791ba636422a964adf9c8475afeb7b7bb2a55b5647aae8f858_983fa92e57e16377.jpg 1440w, https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-8aedd8dfb87a05791ba636422a964adf9c8475afeb7b7bb2a55b5647aae8f858_983fa92e57e16377-711x400.jpg 711w, https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-8aedd8dfb87a05791ba636422a964adf9c8475afeb7b7bb2a55b5647aae8f858_983fa92e57e16377-1400x788.jpg 1400w, https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-8aedd8dfb87a05791ba636422a964adf9c8475afeb7b7bb2a55b5647aae8f858_983fa92e57e16377-768x432.jpg 768w, https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-8aedd8dfb87a05791ba636422a964adf9c8475afeb7b7bb2a55b5647aae8f858_983fa92e57e16377-1320x743.jpg 1320w, https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-8aedd8dfb87a05791ba636422a964adf9c8475afeb7b7bb2a55b5647aae8f858_983fa92e57e16377-600x338.jpg 600w, https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-8aedd8dfb87a05791ba636422a964adf9c8475afeb7b7bb2a55b5647aae8f858_983fa92e57e16377-64x36.jpg 64w\" sizes=\"auto, (max-width: 1440px) 100vw, 1440px\" \/><\/p>\n<h3><strong>Component 2: for energy sales<\/strong><\/h3>\n<p>Component 2 is for enterprises that build a PV system for <strong data-start=\"1740\" data-end=\"1792\">selling electricity on the free market<\/strong>, with an allowable capacity of<strong data-start=\"1814\" data-end=\"1825\"> up to 5 MW<\/strong>, and here too the installation should be in<strong data-start=\"1863\" data-end=\"1889\"> combination with batteries<\/strong>.<\/p>\n<p>&nbsp;<\/p>\n<h2><strong>Territorial scope of support for photovoltaic systems and facilities<\/strong><\/h2>\n<p data-start=\"1959\" data-end=\"2069\">Financing is available only to SMEs operating and applying for investment in the territory of:<\/p>\n<ul data-start=\"2070\" data-end=\"2320\">\n<li data-start=\"2070\" data-end=\"2089\">\n<p data-start=\"2072\" data-end=\"2089\"><strong data-start=\"2072\" data-end=\"2089\">Pernik region<\/strong><\/p>\n<\/li>\n<li data-start=\"2090\" data-end=\"2112\">\n<p data-start=\"2092\" data-end=\"2112\"><strong data-start=\"2092\" data-end=\"2112\">Kyustendil region<\/strong><\/p>\n<\/li>\n<li data-start=\"2113\" data-end=\"2138\">\n<p data-start=\"2115\" data-end=\"2138\"><strong data-start=\"2115\" data-end=\"2138\">Stara Zagora region<\/strong><\/p>\n<\/li>\n<li data-start=\"2139\" data-end=\"2320\">\n<p data-start=\"2141\" data-end=\"2320\"><strong data-start=\"2141\" data-end=\"2174\">10 municipalities from the Maritsa Basin<\/strong>: <strong data-start=\"2175\" data-end=\"2282\">Nova Zagora, Yambol, Simeonovgrad, Harmanli, Topolovgrad, Haskovo, Dimitrovgrad, Elhovo, Sliven and Tundzha<\/strong><\/p>\n<\/li>\n<\/ul>\n<p>These areas are a priority, as it is there that the local economy is expected to reorient towards cleaner energy sources.<\/p>\n<p>&nbsp;<\/p>\n<h2><strong>Who can apply for the SME Energy Efficiency Program?<\/strong><\/h2>\n<p data-start=\"2356\" data-end=\"2394\">The following can apply under the procedure:<\/p>\n<ul data-start=\"2395\" data-end=\"2732\">\n<li data-start=\"2395\" data-end=\"2474\">\n<p data-start=\"2397\" data-end=\"2474\"><strong data-start=\"2397\" data-end=\"2442\">traders under the Commercial Act \/ cooperatives<\/strong> (or equivalent persons from the EEA),<\/p>\n<\/li>\n<li data-start=\"2475\" data-end=\"2534\">\n<p data-start=\"2477\" data-end=\"2534\">with <strong data-start=\"2488\" data-end=\"2533\">micro, small or medium-sized enterprise (SME) status<\/strong>,<\/p>\n<\/li>\n<li data-start=\"2535\" data-end=\"2732\">\n<p data-start=\"2537\" data-end=\"2732\">who, at the time of application, are <strong data-start=\"2573\" data-end=\"2604\">conducting business activities<\/strong> in the eligible districts\/municipalities and are applying for investments that will be implemented there.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2734\" data-end=\"2826\"><strong data-start=\"2734\" data-end=\"2824\">Minimum net sales revenue for 2024 (for existing businesses over 2 years):<\/strong><\/p>\n<ul data-start=\"2827\" data-end=\"2950\">\n<li data-start=\"2827\" data-end=\"2855\">\n<p data-start=\"2829\" data-end=\"2855\"><strong data-start=\"2836\" data-end=\"2853\">micro: \u2265 100,000 BGN.<\/strong><\/p>\n<\/li>\n<li data-start=\"2856\" data-end=\"2884\">\n<p data-start=\"2858\" data-end=\"2884\"><strong data-start=\"2865\" data-end=\"2882\">small: \u2265 250,000 BGN<\/strong><\/p>\n<\/li>\n<li data-start=\"2885\" data-end=\"2950\">\n<p data-start=\"2887\" data-end=\"2950\"><strong data-start=\"2895\" data-end=\"2912\">average: \u2265 800,000 BGN<\/strong><\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2952\" data-end=\"3127\">Restriction:<strong data-start=\"2965\" data-end=\"3017\"> one applicant, together with affiliated enterprises<\/strong>, is entitled to submit<strong data-start=\"3039\" data-end=\"3052\"> only one project<\/strong> proposal under the procedure.<\/p>\n<p>&nbsp;<\/p>\n<h2><strong>Amount and intensity of aid for photovoltaic systems and installations<\/strong><\/h2>\n<table width=\"565\">\n<thead>\n<tr>\n<td><strong>Component<\/strong><\/td>\n<td width=\"139\"><strong>SME category<\/strong><\/td>\n<td width=\"100\"><strong>Min. help<\/strong><\/td>\n<td width=\"149\"><strong>Max. help<\/strong><\/td>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Own consumption<\/td>\n<td width=\"139\">Micro \/ Small<\/td>\n<td width=\"100\">100,000 BGN<\/td>\n<td width=\"149\">500,000 BGN<\/td>\n<\/tr>\n<tr>\n<td>Own consumption<\/td>\n<td width=\"139\">Average<\/td>\n<td width=\"100\">100,000 BGN<\/td>\n<td width=\"149\">3,000,000 BGN<\/td>\n<\/tr>\n<tr>\n<td>Energy Sales<\/td>\n<td width=\"139\">All<\/td>\n<td width=\"100\">500,000 BGN<\/td>\n<td width=\"149\">6,500,000 BGN<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p data-start=\"3529\" data-end=\"3570\">The intensity depends on the aid regime:<\/p>\n<ul data-start=\"3571\" data-end=\"3948\">\n<li data-start=\"3571\" data-end=\"3645\">\n<p data-start=\"3573\" data-end=\"3645\">for <strong data-start=\"3577\" data-end=\"3591\">de minimis<\/strong>: <strong data-start=\"3593\" data-end=\"3603\">up to 65%<\/strong><\/p>\n<\/li>\n<li data-start=\"3646\" data-end=\"3948\">\n<p data-start=\"3648\" data-end=\"3754\">under the<strong data-start=\"3652\" data-end=\"3694\"> &#8220;regional investment aid&#8221;<\/strong> regime (different intensity by type of expenditure and size of enterprise):<\/p>\n<ul data-start=\"3757\" data-end=\"3948\">\n<li data-start=\"3757\" data-end=\"3834\">\n<p data-start=\"3759\" data-end=\"3834\"><strong data-start=\"3762\" data-end=\"3790\">for photovoltaic installations<\/strong>: <strong data-start=\"3792\" data-end=\"3799\">65%<\/strong> (micro\/small) and<strong data-start=\"3816\" data-end=\"3823\"> 55%<\/strong> (medium)<\/p>\n<\/li>\n<li data-start=\"3837\" data-end=\"3948\">\n<p data-start=\"3839\" data-end=\"3948\"><strong data-start=\"3842\" data-end=\"3866\">for batteries<\/strong> (storage):<strong data-start=\"3868\" data-end=\"3875\"> 50%<\/strong> (micro\/small) and<strong data-start=\"3892\" data-end=\"3899\"> 40%<\/strong> (medium)<\/p>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>The total budget of financial support for photovoltaic systems and facilities amounts to BGN 141.77 million, provided by the Just Transition Fund and national co-financing.<\/p>\n<p>Supported enterprises must maintain the sustainability of the project for at least three years after its final completion.<\/p>\n<p>&nbsp;<\/p>\n<h2><strong>What expenses are eligible?<\/strong><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-89419\" src=\"https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-cb2ce282ec84b90177719f1ca20d0c736f41fd3346327ebee09dbeaae6e3be48_7d6a05ab787045ab-280x280.jpg\" alt=\"Support for photovoltaic systems and facilities of SMEs\" width=\"280\" height=\"280\" srcset=\"https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-cb2ce282ec84b90177719f1ca20d0c736f41fd3346327ebee09dbeaae6e3be48_7d6a05ab787045ab-280x280.jpg 280w, https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-cb2ce282ec84b90177719f1ca20d0c736f41fd3346327ebee09dbeaae6e3be48_7d6a05ab787045ab-300x300.jpg 300w, https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-cb2ce282ec84b90177719f1ca20d0c736f41fd3346327ebee09dbeaae6e3be48_7d6a05ab787045ab-100x100.jpg 100w, https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-cb2ce282ec84b90177719f1ca20d0c736f41fd3346327ebee09dbeaae6e3be48_7d6a05ab787045ab-32x32.jpg 32w\" sizes=\"auto, (max-width: 280px) 100vw, 280px\" \/><\/p>\n<p>Local storage facilities (batteries) must have a<strong data-start=\"4069\" data-end=\"4098\"> minimum capacity (kWh)<\/strong> equivalent to storing <strong data-start=\"4125\" data-end=\"4172\">at least 1 hour for 100% of the installed capacity<\/strong> of the PV system under the project.<\/p>\n<p>Equivalent combinations are also permissible (e.g.<strong data-start=\"4247\" data-end=\"4264\"> 2 hours for 50%<\/strong> or <strong data-start=\"4269\" data-end=\"4286\">4 hours for 25%<\/strong> of power).<\/p>\n<p data-start=\"4382\" data-end=\"4433\">\n<p data-start=\"4382\" data-end=\"4433\">\n<p data-start=\"4382\" data-end=\"4433\">\n<p data-start=\"4382\" data-end=\"4433\">\n<p data-start=\"4382\" data-end=\"4433\">\n<p data-start=\"4382\" data-end=\"4433\">\n<p data-start=\"4382\" data-end=\"4433\">The PV system with batteries must be built on:<\/p>\n<ul data-start=\"4434\" data-end=\"4751\">\n<li data-start=\"4434\" data-end=\"4578\">\n<p data-start=\"4436\" data-end=\"4578\"><strong data-start=\"4436\" data-end=\"4485\">building\/property \u2013 fully owned by the applicant<\/strong>,<strong data-start=\"4492\" data-end=\"4540\"> the building must be put into operation on the date of application<\/strong>, <strong data-start=\"4571\" data-end=\"4578\">or<\/strong><\/p>\n<\/li>\n<li data-start=\"4579\" data-end=\"4751\">\n<p data-start=\"4581\" data-end=\"4751\"><strong data-start=\"4581\" data-end=\"4623\">building\/property with established building rights<\/strong> for the applicant (again with a building put into operation on the date of application).<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"4753\" data-end=\"4901\">It is not permissible for the investment to be carried out on a building\/property used by the applicant under <strong data-start=\"4843\" data-end=\"4860\">lease\/concession.<\/strong><\/p>\n<p>However, projects that have already been implemented or those that receive support from other programs are not funded in order to avoid double funding.<\/p>\n<p>&nbsp;<\/p>\n<h3><strong>Implementation period and sustainability<\/strong><\/h3>\n<p data-start=\"6113\" data-end=\"6249\">The deadline for project implementation is<strong data-start=\"6156\" data-end=\"6172\"> up to 24 months<\/strong>, but no later than<strong data-start=\"6192\" data-end=\"6209\"> 31.12.2029<\/strong>.<\/p>\n<p data-start=\"6251\" data-end=\"6527\">After the aid is paid, <strong data-start=\"6312\" data-end=\"6327\">sustainability requirements<\/strong> usually apply &#8211; the assets must be used for their intended purpose and not be alienated\/given away contrary to the conditions for a certain period (including restrictions on disposal).<\/p>\n<p>&nbsp;<\/p>\n<h2><strong>How Solar House supports your successful application<\/strong><\/h2>\n<p>With many years of experience in the design, construction and legalization of<a href=\"https:\/\/solarhouse.bg\/en\/construction-of-photovoltaic-system-for-business\/\" target=\"_blank\" rel=\"noopener\"> photovoltaic systems for businesses<\/a>, the Solar House team is a reliable partner for businesses that want to take advantage of the opportunities of the new energy efficiency program.<\/p>\n<p>Our experts will assist you in the preliminary technical analysis, determining the optimal power and configuration of the system, including preparing an application offer.<\/p>\n<p>\u041e\u0442 \u043f\u044a\u0440\u0432\u043e\u043d\u0430\u0447\u0430\u043b\u043d\u0430\u0442\u0430 \u0438\u0434\u0435\u044f \u0434\u043e \u0440\u0435\u0430\u043b\u0438\u0437\u0430\u0446\u0438\u044f\u0442\u0430 \u2013 \u043f\u043e\u0435\u043c\u0430\u043c\u0435 \u0446\u0435\u043b\u0438\u044f \u043f\u0440\u043e\u0446\u0435\u0441 \u201e\u0434\u043e \u043a\u043b\u044e\u0447\u201c, \u043e\u0441\u0438\u0433\u0443\u0440\u044f\u0432\u0430\u0439\u043a\u0438 \u043d\u0430 \u0412\u0430\u0448\u0438\u044f \u0431\u0438\u0437\u043d\u0435\u0441 \u043c\u0430\u043a\u0441\u0438\u043c\u0430\u043b\u043d\u0430 \u0435\u043d\u0435\u0440\u0433\u0438\u0439\u043d\u0430 \u043d\u0435\u0437\u0430\u0432\u0438\u0441\u0438\u043c\u043e\u0441\u0442, \u043f\u043e-\u043d\u0438\u0441\u043a\u0438 \u0440\u0430\u0437\u0445\u043e\u0434\u0438 \u0438 \u0431\u044a\u0440\u0437\u0430 \u0432\u044a\u0437\u0432\u0440\u044a\u0449\u0430\u0435\u043c\u043e\u0441\u0442 \u043d\u0430 \u0438\u043d\u0432\u0435\u0441\u0442\u0438\u0446\u0438\u044f\u0442\u0430.<\/p>\n<p><a href=\"https:\/\/solarhouse.bg\/en\/contact\/\" target=\"_blank\" rel=\"noopener\">Contact SolarHouse<\/a> to receive expert advice.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Support for photovoltaic systems and facilities: BGN 141 million for SMEs The procedure BG16FFPR003-4.011 &#8220;Support for photovoltaic systems and facilities in micro, small and medium-sized enterprises&#8221; is open for applications in the MIS 2020 from 19.12.2025 (11:00 a.m.) to 24.03.2026 (5:00 p.m.). The conditions for application and implementation of investments are published on the UMIS [&#8230;]\n","protected":false},"author":1,"featured_media":89426,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[2006,2007],"tags":[2435],"class_list":["post-89487","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-financing","tag-funding-program"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.9 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Energy Efficiency Program for SMEs<\/title>\n<meta name=\"description\" content=\"New funding for SMEs under the energy efficiency program: BGN 141 million for photovoltaics and batteries in the just transition regions.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Energy Efficiency Program in Just Transition Regions\" \/>\n<meta property=\"og:description\" content=\"New funding for SMEs under the energy efficiency program: BGN 141 million for photovoltaics and batteries in the just transition regions.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/\" \/>\n<meta property=\"og:site_name\" content=\"Solarhouse\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/SolarHouseBG\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-06T11:40:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-02T07:48:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-c58e42de8ea3dce5475606138916f8e85c5fa15ed2f72997c6051cb123c103ab_691e4c9468f4108f.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Solarhouse2\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Solarhouse2\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/\"},\"author\":{\"name\":\"Solarhouse2\",\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/#\\\/schema\\\/person\\\/ae6a4e6708368ab84688fd00a1fe6067\"},\"headline\":\"Energy Efficiency Program in Just Transition Regions\",\"datePublished\":\"2025-11-06T11:40:40+00:00\",\"dateModified\":\"2026-04-02T07:48:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/\"},\"wordCount\":817,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/solarhouse.bg\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/0-02-05-c58e42de8ea3dce5475606138916f8e85c5fa15ed2f72997c6051cb123c103ab_691e4c9468f4108f.jpg\",\"keywords\":[\"funding program\"],\"articleSection\":[\"News\",\"Financing\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/\",\"url\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/\",\"name\":\"Energy Efficiency Program for SMEs\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/solarhouse.bg\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/0-02-05-c58e42de8ea3dce5475606138916f8e85c5fa15ed2f72997c6051cb123c103ab_691e4c9468f4108f.jpg\",\"datePublished\":\"2025-11-06T11:40:40+00:00\",\"dateModified\":\"2026-04-02T07:48:17+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/#\\\/schema\\\/person\\\/ae6a4e6708368ab84688fd00a1fe6067\"},\"description\":\"New funding for SMEs under the energy efficiency program: BGN 141 million for photovoltaics and batteries in the just transition regions.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/#primaryimage\",\"url\":\"https:\\\/\\\/solarhouse.bg\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/0-02-05-c58e42de8ea3dce5475606138916f8e85c5fa15ed2f72997c6051cb123c103ab_691e4c9468f4108f.jpg\",\"contentUrl\":\"https:\\\/\\\/solarhouse.bg\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/0-02-05-c58e42de8ea3dce5475606138916f8e85c5fa15ed2f72997c6051cb123c103ab_691e4c9468f4108f.jpg\",\"width\":1600,\"height\":900},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/energy-efficiency-program-in-just-transition-regions\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Energy Efficiency Program in Just Transition Regions\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/#website\",\"url\":\"https:\\\/\\\/solarhouse.bg\\\/\",\"name\":\"SolarHouse.BG\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/solarhouse.bg\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/#\\\/schema\\\/person\\\/ae6a4e6708368ab84688fd00a1fe6067\",\"name\":\"Solarhouse2\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/solarhouse.bg\\\/wp-content\\\/uploads\\\/letter-avatar\\\/9dbf8047f5a7c279317d878b3668ad01.jpg\",\"url\":\"https:\\\/\\\/solarhouse.bg\\\/wp-content\\\/uploads\\\/letter-avatar\\\/9dbf8047f5a7c279317d878b3668ad01.jpg\",\"contentUrl\":\"https:\\\/\\\/solarhouse.bg\\\/wp-content\\\/uploads\\\/letter-avatar\\\/9dbf8047f5a7c279317d878b3668ad01.jpg\",\"caption\":\"Solarhouse2\"},\"sameAs\":[\"https:\\\/\\\/solarhouse.bg\\\/\"],\"url\":\"https:\\\/\\\/solarhouse.bg\\\/en\\\/author\\\/solarhouse2\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Energy Efficiency Program for SMEs","description":"New funding for SMEs under the energy efficiency program: BGN 141 million for photovoltaics and batteries in the just transition regions.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/","og_locale":"en_US","og_type":"article","og_title":"Energy Efficiency Program in Just Transition Regions","og_description":"New funding for SMEs under the energy efficiency program: BGN 141 million for photovoltaics and batteries in the just transition regions.","og_url":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/","og_site_name":"Solarhouse","article_publisher":"https:\/\/www.facebook.com\/SolarHouseBG\/","article_published_time":"2025-11-06T11:40:40+00:00","article_modified_time":"2026-04-02T07:48:17+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-c58e42de8ea3dce5475606138916f8e85c5fa15ed2f72997c6051cb123c103ab_691e4c9468f4108f.jpg","type":"image\/jpeg"}],"author":"Solarhouse2","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Solarhouse2","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/#article","isPartOf":{"@id":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/"},"author":{"name":"Solarhouse2","@id":"https:\/\/solarhouse.bg\/#\/schema\/person\/ae6a4e6708368ab84688fd00a1fe6067"},"headline":"Energy Efficiency Program in Just Transition Regions","datePublished":"2025-11-06T11:40:40+00:00","dateModified":"2026-04-02T07:48:17+00:00","mainEntityOfPage":{"@id":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/"},"wordCount":817,"commentCount":0,"image":{"@id":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/#primaryimage"},"thumbnailUrl":"https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-c58e42de8ea3dce5475606138916f8e85c5fa15ed2f72997c6051cb123c103ab_691e4c9468f4108f.jpg","keywords":["funding program"],"articleSection":["News","Financing"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/","url":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/","name":"Energy Efficiency Program for SMEs","isPartOf":{"@id":"https:\/\/solarhouse.bg\/#website"},"primaryImageOfPage":{"@id":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/#primaryimage"},"image":{"@id":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/#primaryimage"},"thumbnailUrl":"https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-c58e42de8ea3dce5475606138916f8e85c5fa15ed2f72997c6051cb123c103ab_691e4c9468f4108f.jpg","datePublished":"2025-11-06T11:40:40+00:00","dateModified":"2026-04-02T07:48:17+00:00","author":{"@id":"https:\/\/solarhouse.bg\/#\/schema\/person\/ae6a4e6708368ab84688fd00a1fe6067"},"description":"New funding for SMEs under the energy efficiency program: BGN 141 million for photovoltaics and batteries in the just transition regions.","breadcrumb":{"@id":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/#primaryimage","url":"https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-c58e42de8ea3dce5475606138916f8e85c5fa15ed2f72997c6051cb123c103ab_691e4c9468f4108f.jpg","contentUrl":"https:\/\/solarhouse.bg\/wp-content\/uploads\/2025\/11\/0-02-05-c58e42de8ea3dce5475606138916f8e85c5fa15ed2f72997c6051cb123c103ab_691e4c9468f4108f.jpg","width":1600,"height":900},{"@type":"BreadcrumbList","@id":"https:\/\/solarhouse.bg\/en\/energy-efficiency-program-in-just-transition-regions\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/solarhouse.bg\/en\/"},{"@type":"ListItem","position":2,"name":"Energy Efficiency Program in Just Transition Regions"}]},{"@type":"WebSite","@id":"https:\/\/solarhouse.bg\/#website","url":"https:\/\/solarhouse.bg\/","name":"SolarHouse.BG","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/solarhouse.bg\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/solarhouse.bg\/#\/schema\/person\/ae6a4e6708368ab84688fd00a1fe6067","name":"Solarhouse2","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/solarhouse.bg\/wp-content\/uploads\/letter-avatar\/9dbf8047f5a7c279317d878b3668ad01.jpg","url":"https:\/\/solarhouse.bg\/wp-content\/uploads\/letter-avatar\/9dbf8047f5a7c279317d878b3668ad01.jpg","contentUrl":"https:\/\/solarhouse.bg\/wp-content\/uploads\/letter-avatar\/9dbf8047f5a7c279317d878b3668ad01.jpg","caption":"Solarhouse2"},"sameAs":["https:\/\/solarhouse.bg\/"],"url":"https:\/\/solarhouse.bg\/en\/author\/solarhouse2\/"}]}},"_links":{"self":[{"href":"https:\/\/solarhouse.bg\/en\/wp-json\/wp\/v2\/posts\/89487","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solarhouse.bg\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solarhouse.bg\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solarhouse.bg\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/solarhouse.bg\/en\/wp-json\/wp\/v2\/comments?post=89487"}],"version-history":[{"count":2,"href":"https:\/\/solarhouse.bg\/en\/wp-json\/wp\/v2\/posts\/89487\/revisions"}],"predecessor-version":[{"id":91105,"href":"https:\/\/solarhouse.bg\/en\/wp-json\/wp\/v2\/posts\/89487\/revisions\/91105"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/solarhouse.bg\/en\/wp-json\/wp\/v2\/media\/89426"}],"wp:attachment":[{"href":"https:\/\/solarhouse.bg\/en\/wp-json\/wp\/v2\/media?parent=89487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solarhouse.bg\/en\/wp-json\/wp\/v2\/categories?post=89487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solarhouse.bg\/en\/wp-json\/wp\/v2\/tags?post=89487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}